Entirely independent of the city’s power grid, the plant delivers a power load of 3000kva- fully 50% greater than the Metropolitan’s maximum projected peak power consumption providing plenty of potential for upgrading to accommodate tenants’ future growth demands. By using a configuration of three generators, the system has two layers of backup.